This project consisted in the modification of the existing arena into Olympic rink and the addition of a soccer field house size divided into three 7-player soccer fields connected to the existing building.
The expertise of HONCO team was put at contribution for the development of the budgets at both prefeasibility and construction phases. Our services were retained for the supply and installation of the structures and the building envelope. A close cooperation was maintained between all the professionals involved in the project.
Although the project was planned to be carried out in a very tight work schedule, all people involved in the project worked as a team to meet the planned schedule.