For this 2020 project, Honco Buildings was awarded a contract to design and manufacture the arena and gymnasium building structures with McDonald Bros. Construction.
An NHL compliant arena that allows for skating events thanks to its refrigeration system that is operational for 8 months.
The arena facilities include 5 player rooms and 1 referee room, 294 spectator seats, 100 standing room and a mobility lift.
The building also incorporates new administrative offices, a training room, and an elevated walking track at the perimeter of the gym.