Honco has been awarded a contract for the design, manufacture and delivery of the roof system to be installed on a concrete structure.
The project consisted of the construction of a semi-Olympic heated pool, operational year-round and equipped with 1,200 seats, including 70 VIPs. The complex included a 25 x 50m competition pool, convertible into two 25 x 25m pools via movable walls, a press gallery and a conference room.